We're at the interior construction stage. Spent the weekend before the hot tub arrived furiously painting and staining, and now Brenda's doing interior trim work on the windows and installing the wainscotting.

I've rearranged the pictures to show the most recent first, so if this is your first visit, start from the bottom of the page.
The south wall, with the protective film off the windows and the light coming in. The day I took this picture wasn't even a particularly sunny day.
south wall
A view of the west wall with the delivered hot tub!.
west wall
The guys finished shingling the south wall today, 10/3. Brenda had worked over the weekend, shingling the entire, west wall and the south wall up to the trapezoid windows. I got a first coat of paint on the trim over the weekend.
shingled
The inside drywalling is almost finished. Just a last coat of mud and a final sanding needed before we start to paint.
drywall1
Another view of the drywalled interior. It gives an idea of what the view will be once we get the film off the windows.
drywall 2
The windows came in today (9/20). The men used a lift to carry up the high trapezoid window.
window lift
Brenda helped. I just tried to stay out of the way.
brenda helped
They got all the windows in on 9/20, except for the sliding glass door. It can't go in until the hot tub is delivered. All the window trim is forest green, with unfinished wood on the inside.
windows in
I started the retaining wall the weekend of 9/18. The concrete blocks are 95 lbs. each (105 for the corner pieces), so I figure I moved 1 1/2 tons of concrete. The roof is almost totally singled. 9/18/06
retaining wall
South wall was framed and sheeted next. Look at the window openings!
southwall
Our contractors sheeting the roof. From left, Don and Carl on ladders, Sheldon on ground.
big dog play
East and West walls were framed first, 9/9/06
west wall
Pouring the slab.
slab